01
Lock the Model Version Before a Production Run
Development models often change hole positions, wall thickness, or mounting. Label file versions and identify which passed assembly validation. For multiple models in one batch, specify quantities and relationships to avoid mixing versions. If the design is not final, validate samples before increasing quantities.
- State the file version, confirmation date, and scope of use.
- Distinguish validated results from dimensions still awaiting confirmation.
- For sets, list the number of sets and the parts in each set.
02
What Should First-Part Validation Check?
First-part validation is more than an appearance check. Review critical dimensions, assembly, operation, and surface requirements for the intended use, recording acceptable features and changes needed. Keep confirmed colors, materials, and processes consistent. If anything changes, update the file version and instructions so an old approval does not override the new design.
- Check critical holes, mounting surfaces, and mating components.
- Confirm visible surfaces, support locations, and required finishing.
- Validate actual operation. Photos do not replace an assembly check.
03
What Information Is Needed for Batch Planning?
Provide quantities per model, target delivery date, phased delivery, packaging, and set requirements. The system can estimate from models, materials, and quantities; actual production arrangements and special needs receive an engineering review. File and order limits in the quote form are usage rules, not promises of capacity or delivery time.
- List quantities per model. Do not upload the same file repeatedly to indicate quantity.
- For phased delivery, specify priorities and intended uses.
- For version tracking, agree which model and confirmation records apply to each batch.
Frequently Asked Questions
Clarify Your Requirements Before Requesting a Quote
How Do I Request a Small-Batch Parts or Enclosure Quote?
Set each model's quantity in the quote form and state set, phased delivery, and packaging requirements. Estimates use the actual model and material, with production arrangements confirmed by staff. Do not upload duplicate files to indicate quantity.
Is There a Fixed Minimum Order Quantity or Lead Time?
This page does not promise an unconfirmed minimum order or lead time. Submit the actual models, material, quantity, and target date for a system estimate and staff confirmation.
Can We Discuss a Batch While the Design Is Still Changing?
Yes. Explain target quantities and use, but keep sample validation separate from final version approval. For model changes, use editing or development consulting first, then submit the confirmed files for printing.